Network InstallationOffice Move

Comms Room Fit out with Rack & Stack Service in Paris.

The main challenges were distance, working in conjunction with the global fit-out company and local contractors, plus sourcing the equipment as per their Global Standards.
Challenge:

A global tech company needed assistance setting up the comms room for their new Paris office.

 

Solution:

Our team installed 2 x 4-post Chatsworth Racks, with horizontal and vertical Panduit cable management systems, just as the last Cat6 a cable had been pulled into the room, allowing the local contractor to terminate into the rack without any delays.

Once the fit-out was complete (clean site) our engineer returned to install the routers, firewalls, network switches and Wireless Access Points throughout the office space (20,000 sq ft) and provided hands on assistance to help their US based network team get the site online.

Outcome:

All works were completed on time, site go live date was completed 2 weeks before the office opened allowing their workspace/facilities team to be onsite to make the space ready for their staff and official office opening date.

Related Projects

CCTV cameras installed on a pole overlooking the entrance and perimeter fencing of a commercial storage yard.
CCTVData CablingNetwork Installation

Commercial Storage Yard Connectivity & CCTV Installation in Sheerness

Several elevated CCTV cameras fixed to poles around a commercial yard to provide wide‑angle surveillance coverage.
CCTVData CablingNetwork Installation

Industrial Storage Yard Network & CCTV Installation in Kent

Let’s Connect

Ready to upgrade your network or plan a new installation?

Contact us today for a free consultation or site survey.